Where is they money for service parts software? Companies will end up spending one way or another, either on solutions that can help the rather weak state of service parts management improve, or by continuing to incur high obsolescence and other costs.
The Current S
No Comments
Setting Global Service Levels
One of the most important areas of functionality in several service parts planning applications is the ability to perform "global" service level planning. Global service level planning allows the planner to set the same or different serv
Generally service parts planning differs from final product planning in the following ways:
A high number of low volume irregular demand items in the planning database
Inapplicability of traditional measures of forecast error (service parts management has much higher
SAP ERP Repair Lead Times
When receiving repair lead times and costs from SAP, there are several different ways to approach obtaining this information:
Repair Lead TimeCostsThis issue is that SAP has not set up the material master for out of
the box functionality wit
Service parts for this airplane can be predicted based upon installed base and usage. The math for doing this is simple and present in multiple service parts planning applications. However, the problem is that most companies do not invest in the data maintenance.
Wha
PBL and Alternatives
Performance Based Logistics is a strategy for system support. Instead of goods and services a supplier is paid for a guaranteed level of performance and system capability. The supplier often has to guaranty the performance at lesser costs but has
<span style="color:#000000;">The data side of any type of planning system, and by extension service parts planning is quite important. Planning data is aggregated from transaction data and is usually much lower in volume than the data held in transaction systems
PBL and Alternatives"Performance Based Logistics is a strategy for system support. Instead of goods and services a supplier is paid for a guaranteed level of performance and system capability. The supplier often has to guaranty the performance at lesser costs but has
What is Part Supersession?
Supersession is one of the most important functions in any service parts planning system. Supersession is used to both:
Substitute one part for another part
Obsolesce parts due to engineering changes driven by PLM (Product Lifecycle Man
What Is It?
Multi-echelon inventory optimization is a functionality within advanced planning software that allows for the planning of a supply network in a specific way which changes the normal assumptions of the relationship between locations. Unlike normal advance
